
Large printing house
In printing houses, most of the materials that go to waste are generated when the finished products are cut, so getting the cut material out of the process quickly is a prerequisite for a working process. When the volumes are large, the amount of cutting waste is also very high.
Description of the project
In printing houses, most of the materials that go to waste are generated when cutting finished products, so getting the cut material out of the process quickly is a prerequisite for a working process. When the volumes are large, the amount of cutting waste is also very high. Het probleem voor het kundens is om een moderne waste-collectie en transportsysteem in de anciële premises en combineren met nieuwe presses. Kapasiteity proposed a total delivery where we were responsible for defining the equipment needs, designing, manufacturing, installation and commissioning of the air transport system that transports waste material and the waste extruder system.
Equipment supplied
- 1 pcs Tunnel® 400 T stand-alone press + Hydraulic tank opening plate + 40 m3 tank + automatic start
- 2 pcs Tunnel® 400 XTS stand-alone press + 40 m3 tank /1 for cardboard and 1 for energy
- 3pcs Tunnel® AKL Dispenser
- 1 pcs AWDS™ air transport system cuts for waste
practical benefits
See the next project

It is the responsibility of municipalities and cities to be responsible for collecting household municipal waste, which is not the responsibility of the smallest end. There are many things and variables involved in the collection of household waste. A small snow ant can cause surprising chain reactions that then appear at the end of the collection when you need to make up for lost time.
contact us
Feel free to contact us and we will discuss your project together.
Contact
Request for quotation
Service Order
Accessory order

Iiro Kankaansyrjä
2nd Generation Entrepreneur